Panelmasta Contemporary Garage Roller Doors

The garage doors were installed 26th Nov. They are the standard Panelmasta Contemporary doors in Shale Grey. We were umming and arring about whether to go for the upgraded stained look to match the stained front door but in the end we decided to save the money and stick with the standard painted colours. We chose Shale Grey to match the facade render colour (Rampart).



Here's the look from the outside. The facade hasn't had it's final render coat on yet so no idea how well the Rampart and Shale Grey will go together. That yellow spot is my sensor light! :)


Looking out...


The auto roller machine

Here's the back roller door. It's all manual rolling for this one. 

It's meant to be a standard single car width but there's no way I'm going to squeeze any car through here. O well, at least the wheel burrow can go through nicely. 

Unfortunately, there's already a scratch on the back door. Not sure what the go is with scratched doors but I'm reporting this to the site supervisor nonetheless. 







Comments

Popular posts from this blog

Interior Paint - Wattyl Winter Mushroom

Painting is complete. We've gone for the grey finish to the walls. Here's how the Winter Mushroom looks. Originally we thought of doing white for the architraves and doors but got convinced by the colour consultant to use the same paint all round. Was a bit worried at first but it has come off nicely. 

Cedar Plank Palandri Carpets Laid

Carpets were laid just before Christmas except for the master bedroom which was getting its squeaks fixed .  We picked the Palandri Category 2 carpets in Cedar Plank colour. Nothing too fancy as Category 2 was the included freebie and we didn't want to pay the Porter Davis premium for upgrades. Figured when it's better to let the kids wear out this one and replace it in a few years time at a much cheaper cost per square metre. Here's a roll of carpet. The most excited I've ever been to see a roll of carpet :)

PCI Checklist

My Practical Completion Inspection is on in about 12 hours time! Here's a comprehensive checklist I've copied from the Homeone forums.